Hello everyone,
An public entity wants to manage a stock of assets.
My doubts are:
- ¿Can an asset be managed as a stock?
- ¿Can an MRP be created for an asset?
- ¿Should I create an asset master instead of a material master?
- ¿Should the asset be created with a material type "Valuated" so this be managed in value and quantity. If I use a material type "Non valuated" (such as: UNBW), I can only manage it as a quantity (like Monitoring or Control).
Please, could someone advise me?
Thank you in advance,
J