Hi Ganesan,
Thanks for the reply.
Is there any particular config/setting which controls this?
ie in the numerator of the formula can we make system look for just "planned cost for the period till date" vs "planned cost for the period"?
or its standard that it always take total planned cost for the period?
Thanks,
Krishna