Hello Sergiy,
Thanks~
I agree with you.
Once the field is available at Attached tab, its assignment should be processed.
Otherwise, Customer will be confused by the system behavior.
I don't think so.
The point is that for the case of DC Group, resource might not be always initialized, in particular, if DC is called at for in queue SFC. Then such assignment might be just skipped.
The test result shows that even the SFC is in queue, DC list will show the DC attached SFC material, POD operation and POD resource. From the code level, system will retrieve the resource from the POD.
Best regards,
Eason