I want to transfer only materials with make to stock 10 strategy group only. But to eliminate the error in MD63 I simply added sub strategy 60 to strategy group 10.

 

Main Strategy   10 Make-to-stock production

*Strategy        60 Planning with planning material

 

Wanted to know if it is logical or not logical at all to do like this because strategy grp 10 is MTS & Strategy group 60 is MTO. So can I add sub strategy 60 in strategy group 10?

 