Hi Brahmankar,
I want to transfer only materials with make to stock 10 strategy group only. But to eliminate the error in MD63 I simply added sub strategy 60 to strategy group 10.
Main Strategy 10 Make-to-stock production
*Strategy 60 Planning with planning material
Wanted to know if it is logical or not logical at all to do like this because strategy grp 10 is MTS & Strategy group 60 is MTO. So can I add sub strategy 60 in strategy group 10?
Thanks
Sakthi